Project No. 2015-03

Project Name: La Quinta Village Complete Streets Project

Project Number: 2015-03
 
Location: La Quinta Village

Roundabout locations:

  • Calle Tampico/Bermudas  (Stage 1: June 2019 - January 2020)
  • Calle Tampico/Desert Club (Stage 1: June 2019 - January 2020)
  • Sinaloa/Bermudas (Stage 2: January 2020 - May 2020)
  • Calle Tampico/Eisenhower (Stage 3: May 2020- October 2020)
  • Eisenhower/Montezuma (Stage 3: May 2020- October 2020)

Street Rendering3

Description:

 

The City of La Quinta was awarded an ATP Cycle 3 Grant for “La Quinta Village Complete Streets – A Road Diet Project” (Project No. 201503) in the amount of $7,313,000. This proposed project will include the construction of five new roundabouts in the La Quinta Village where pedestrian, bicycle, golf cart, and automobile traffic exists. These roundabouts will help to accommodate non-vehicular traffic. The La Quinta Village Complete Streets project is focused on making roadways safer and more accessible to pedestrians and bicycles in the La Quinta Village.

 

The Project will reduce four traffic lanes to two lanes along Calle Tampico and Calle Sinaloa from Eisenhower to Desert Club Drive, and along Eisenhower from Calle Tampico to Calle Sinaloa. This area will be used as space for designated bike and golf cart lanes. Roundabouts will be installed at five key intersections, Calle Tampico and Desert Club Drive, Calle Tampico and Avenida Bermudas, Calle Tampico and Eisenhower Drive, Eisenhower Drive and Avenida Montezuma, and Calle Sinaloa/Avenue 52 and Avenida Bermudas, to provide better traffic flows.

The reduced lanes and crosswalks added midblock will provide pedestrians with safer access to Civic Center Park, Old Town La Quinta, and the Benjamin Franklin Elementary School. In addition, this project includes drainage and landscaping enhancements. The Project improvements were developed through public outreach meetings related to the Village Specific Plan.

VIDEO RENDERING

Project Budget: $13,587,986
 
Actual Cost: TBD 

 

Funding Source(s):  ATP Cycle 3 Grant, Measure G, Measure A and SB1, Infrastructure Funds

 

Start Date: June 2019 
 
End Date: Anticipated to be complete in October 2020
 
Status: In Design

Want to learn more about Roundabouts and Road Diets?

What is a Modern Roundabout? FAQ

Road Diet Fact Sheet

Information Guide

Safety Article

Emergency Response Times

Roundabouts and First Responders

Federal Highway Administration (FHWA) Road Diet Case Studies

Complete Streets Anticipated Construction Schedule

Complete Streets landscape roundabout rendering

Complete Streets Project Exhibit

Street Rendering2

CalleTampicoEisenhowerDrive

Street Rendering4